山东绿化苗木种植时的准备工作有哪些

山东绿化苗木

施工前。必须提前做好各项的施工的准备工作以确保工程顺利的进行,开始施工前准备工作的内容包括,掌握资料、熟悉设计、勘查现场、制定方案、编制预算、材料供应和现场准备,开工前应了解掌握工程的相关的资料。

Shandong green nursery before construction. Must be well in advance preparations for the construction of various to ensure project smoothly, start pre construction preparation work, including content, master data, familiar with design, surveying the scene, make plan, budget, material supply and site preparation, before the commencement of construction should grasp the project related information about the.

如用地手续、上级批示、工程投资来源、工程要求等,山东绿化苗木施工前必须熟悉设计的指导思想、设计意图、图纸、质量、艺术水平的要求,并由设计人员向施工单位进行设计交底现场勘查,施工人员了解设计意图及组织有关人员到现场勘查一般包括,现场周围环境、施工条件、电源、水源、土源、交通道路、堆料场地、生活暂设的位置,以及市政、电讯应配合的部门和定点放线的依据,工程开工前应制定施工方案包括以下内容,工程概况、确定施工方法、编制施工程序和进度计划、施工组织的建立、现场平面布置图,编制施工预算应根据设计概算、工程定额和现场施工条件、采取的施工方法等编制施工预算。

As for the procedures, instructions, engineering investment sources, the engineering requirements, must be familiar with the design guidelines, design, drawings, quality and artistic level of Shandong green seedlings before construction, and by the design personnel to the construction unit to carry out design work on-site investigation, construction personnel to understand the design intention and organize the relevant personnel to the scene the exploration of the surrounding environment, including general, on-site construction conditions, power supply, water source, soil source, transportation, piling site, temporary living place, and on the basis of municipal, telecommunications should cooperate with the departments and fixed line, before the commencement of construction should formulate the construction scheme including the following, the general situation of the engineering, construction method and the preparation of construction schedule, construction procedures and the establishment of the organization, site layout, design and construction budget should be based on the budget for the design and site construction engineering quota and construction method of working conditions, take the construction budget.

重点材料的准备:如特殊需要的苗木、材料应事先了解来源、材料质量、价格、可供应情况,做好现场准备包括:三通一平、搭建暂设房屋、生活设施、库房、事先与市政、电讯、公用、交通等有关单位配合好,并办理有关手续劳动力、机械、运输力应事先由专人负责联系安排好,承包的植树工程应事先与建设单位签订承包合同办理必要手续合同生效后方可施工。山东绿化苗木

Preparation of key materials, such as special need of seedling, material should be prior knowledge about the origin, material quality, price, supply and well site preparation, including: three links one ping, set up set up temporary housing, living facilities, warehouse, prior and municipal, telecommunications, utilities, transportation and other relevant units with good, and for relevant formalities labor, machinery, transportation should be in advance by the contact person responsible for the arrangements, the contracted tree planting projects should advance with the construction unit signed a contract contract of the necessary procedures for the effective before construction.